Skip to content

Commit

Permalink
Watermaker procedure
Browse files Browse the repository at this point in the history
  • Loading branch information
bergie committed Mar 21, 2024
1 parent 5864ec5 commit f901402
Showing 1 changed file with 13 additions and 1 deletion.
14 changes: 13 additions & 1 deletion docs/systems/plumbing.md
Original file line number Diff line number Diff line change
Expand Up @@ -46,4 +46,16 @@ The sea water tap and the watermaker should only be opened in clean sea water.

## Watermaker

TODO
- [ ] Ensure water around the boat is clean (no oil spills, no algae)
- [ ] Ensure engine raw water seacock and the watermaker valve are open
- [ ] Run the watermaker output hose into the sink
- [ ] Run the watermaker reject brine hose into the sink
- [ ] Start watermaker by turning on the circuit
- [ ] Run watermaker for about 10 minutes, then run the output into a cup
- [ ] Test the water quality with TDS meter (should be <300ppm)
- [ ] Taste test the water
- [ ] If passing, move output hose into a canister
- [ ] Log watermaker start time and ppm
- [ ] Run until canister is nearly full
- [ ] Run output again into a cup and test with TDS meter
- [ ] Shut off watermaker and log time and ppm

0 comments on commit f901402

Please sign in to comment.